Heritage and Archaeology · Heritage Consultant
Cambridge Architectural Research
Cambridge Architectural Research provides independent, research-based consultancy and advice to policy-makers, design professionals, building owners and the construction industry on buildings and the built environment.
Heritage Consultant
Details
- Website
- https://carltd.com/
- info@carltd.com
- Phone
- 01223 460475
- Companies House
- Not matched
Roles on applications
- Heritage Consultant2
Where they work
Only count applications
Authority: Sevenoaks
| Application | Date | Their role | Named contacts | Status |
|---|---|---|---|---|
| Sevenoaks Change of use, extension and conversion of Hoopers House and workshop to create 18 new en-suite bedrooms joining with the rear of no 24. Alteration to fenestration and installation of dormers. Creation of new courtyard garden and boundary wall. Installation of PV panels to the roof of the new extension. Erection of new entrance porch to 18a, alterations to fenestration including the installation of rooflights. Removal of lean-to sheds and installing of ramps. Single storey extensions in rear gardens of no 14 and 16. Erection of first-floor link extension to No.16. Alteration to fenestration of nos. 18-24 including new rooflights. Hard and soft Landscaping. Removal of loggia roof brick boundary wall and existing sheds. Installation of Air Source Heat Pumps with enclosure to east of the site. Installation of proposed attenuation tank to rear garden of no 18. | 5 Jan 2026 | Heritage ConsultantHeritage statement and impact assessment | David BonnerResearcherNick ChappleReport authorWilliam FawcettReport author | GrantedGranted |
| Sevenoaks Internal alteration to facilitate conversion into 18 en-suite bedrooms and opening up of external walls to facilitate new extensions of Hoopers House and workshop. Alteration to fenestration to hoopers house. Internal reconfiguration and the creation of new openings of 18a with link to no.16. Removal and re-routing of existing staircases and installation of new staircase within no 18-24. Formation of opening to connect basements in no. 20-24. Internal alterations including reinstatement of partition wall. Installation of new bathrooms and alteration of ceilings within Nos. 18-24. Installation of new platform lifts. Alteration to fenestration to nos 18-24. Installation of new partitions within nos. 14 & 16. | 5 Jan 2026 | Heritage ConsultantHeritage statement and impact assessment | GrantedGranted |